Commercial

Build-outs and repairs for the businesses around us.

We help local restaurants, salons, offices, and retail spaces refresh, remodel, and maintain their spaces — with scheduling that respects your operating hours and a clean, professional job site.

What we handle

Spaces that work harder.

We focus on light commercial work where craftsmanship and reliability matter more than scale. Whether you're opening a new location, refreshing a tired space, or fixing the things that keep breaking, we'll give you a clear plan and a clear price.

Commercial Projects

Real commercial remodeling and build-out projects by ESM Construction LLC.

Commercial Project 01

Commercial Reception Build-Out & Interior Renovation

This commercial renovation transformed a large open existing space by creating a new enclosed reception and work area for the client. ESM Construction LLC handled the full interior build-out — metal stud framing, drywall, drop ceiling and lighting, LVT flooring, paint, and new commercial doors — plus the renovation and finishing of an additional interior room. The result is a finished, functional commercial interior space.

Scope of work
  • Metal stud framing
  • Drywall installation and finishing
  • Drop ceiling / grid installation
  • Ceiling tiles
  • LED lighting
  • LVT flooring
  • Interior painting
  • New double commercial doors with vision windows
  • Trim and finish work
  • Renovation of an additional interior room
Commercial Project 02

Beauty & Waxing Studio Build-Out

Complete commercial interior renovation and build-out transforming an existing retail space into a modern beauty and waxing studio. ESM Construction LLC completed the interior transformation based on the client's desired layout and design — new and modified interior spaces, wall modifications and new openings, drywall work, new flooring, interior painting, trim and molding, electrical and lighting improvements, installation preparation for beauty stations and mirrors, cabinetry and countertop areas, and a renovated restroom. The finished space includes multiple beauty service areas, treatment spaces, custom interior details, upgraded lighting, new finishes, and a completely updated commercial appearance.

Scope of work
  • Commercial interior renovation and build-out
  • Interior wall modifications and new openings
  • Drywall installation and finishing
  • New flooring installation
  • Interior painting
  • Crown molding, baseboards, and finish carpentry
  • Electrical and lighting upgrades
  • Recessed lighting and decorative fixtures
  • Beauty station and mirror installation preparation
  • Cabinetry and countertop installation
  • Restroom renovation
  • Plumbing fixture installation
  • Doors, trim, and interior finish work
  • Final finishing and detail work
Commercial Project 03

Beauty Studio Interior Build-Out

Commercial interior renovation and build-out for a beauty studio. The client needed an existing commercial space remodeled and adapted to their business layout and design. ESM Construction LLC completed multiple interior improvements including wall modifications, painting and finish work, lighting modifications, installation of custom work areas and furniture, treatment and service spaces, sliding barn-style doors, restroom improvements, electrical work, and final interior detailing. The project also included coordination and installation of the specialty fixtures and equipment required for the beauty studio. The finished space provides a clean, modern, functional layout with multiple service areas and a consistent design throughout the business.

Scope of work
  • Commercial interior remodeling
  • Interior wall modifications
  • Drywall and finish work
  • Interior painting
  • Lighting modifications and installation
  • Electrical modifications
  • Custom furniture and workstation installation
  • Beauty service station installation
  • Treatment room improvements
  • Sliding barn-style door installation
  • Restroom improvements
  • Camera installation
  • Trim and finish carpentry
  • Final touch-ups and detail work
Commercial Project 04

Office Build-Out & Space Division

Commercial office build-out involving the division and reconfiguration of a large existing office space. The existing commercial space was divided to create a separate functional office suite. Within the newly divided area, ESM Construction LLC built multiple private offices and a new hallway system, transforming the existing open space into a finished professional office environment. The work included new metal-stud partition walls, sound-control insulation, drywall installation and finishing, electrical modifications, new recessed lighting, ceiling improvements, new ceiling tiles, commercial doors and hardware, interior transom windows to bring additional light into the office areas, carpet installation, base molding, painting, electrical outlets, exit lighting, and finish work throughout. Existing ceiling components were incorporated where appropriate while new ceiling tiles and lighting were installed as part of the finished build-out. The completed project created a clean, modern and fully functional commercial office layout ready for occupancy.

Scope of work
  • Commercial office space division and reconfiguration
  • New private office construction
  • New hallway construction
  • Metal stud framing
  • Sound-control wall insulation
  • Drywall installation and finishing
  • Electrical modifications and new wiring
  • New recessed lighting
  • Drop ceiling modifications
  • New ceiling tile installation
  • Commercial door and frame installation
  • New door hardware and locks
  • Interior transom window installation
  • Additional interior glazing
  • Carpet installation
  • Base molding and trim
  • Interior painting
  • Electrical outlets and switches
  • Exit lighting
  • Final finish work and detailing
Commercial Project 05

Restaurant & Commercial Kitchen Build-Out

Full commercial restaurant build-out involving extensive demolition, interior reconstruction, utility preparation, kitchen-area construction, service-area construction, finishes, and coordination around commercial food-service equipment. The project began with extensive demolition of the existing interior to prepare the space for its new restaurant layout. Construction included new metal-stud framing and wall systems, drywall installation and finishing, modifications to the ceiling areas, electrical work, plumbing-related floor trenching and utility preparation, and reconstruction of the customer service and commercial kitchen areas. The restaurant interior was rebuilt around the operational requirements of a commercial food-service environment — the finished kitchen incorporates stainless-steel wall surfaces, commercial ventilation equipment, food preparation areas, commercial cooking equipment, refrigeration and work surfaces, and other restaurant infrastructure. The front service area was also constructed and finished with a new service counter, wall finishes, commercial flooring, painting, and architectural detailing. The result was the transformation of an extensively demolished commercial space into a functional restaurant and commercial kitchen environment.

Scope of work
  • Extensive commercial interior demolition
  • Restaurant interior build-out
  • Metal stud framing
  • New partition walls
  • Drywall installation and finishing
  • Concrete floor cutting and trenching for utility work
  • Plumbing and utility preparation
  • Electrical modifications and new electrical work
  • Ceiling modifications
  • Lighting modifications and installation
  • HVAC coordination
  • Commercial kitchen build-out
  • Commercial ventilation / hood area integration
  • Stainless-steel kitchen wall finishes
  • Food preparation and equipment areas
  • Front service counter construction and finishing
  • Commercial flooring
  • Interior painting
  • Wall finishes
  • Finish carpentry and detailing
  • Final commercial interior finishes
Commercial Project 06

Restaurant Dining Area Renovation & Interior Refresh

Interior renovation of an existing restaurant dining and customer service area. The goal was to update the appearance of the space while keeping the existing floor and much of the original layout. The existing decorative relief wall finish was removed, damaged and affected wall sections were opened and replaced with new drywall, and the walls were refinished and painted with a new color scheme. The restaurant’s suspended ceiling was refreshed with new white ceiling tiles, replacing the previous dark red appearance, and the existing lighting was upgraded with new LED fixtures. The front service counter was also updated with new tile finishes while retaining the existing countertop. Decorative wall protection panels with a laminate-style finish were installed along portions of the dining area to provide a more durable surface behind tables and seating. The completed work gave the restaurant a cleaner, brighter, and more modern appearance while reusing elements that remained in good condition.

Scope of work
  • Removal of existing decorative wall finish
  • Selective drywall removal
  • New drywall installation and finishing
  • Wall preparation and interior painting
  • New restaurant color scheme
  • Suspended ceiling tile replacement
  • New white ceiling tiles
  • LED lighting upgrades
  • Front service counter finish improvements
  • New tile installation at service counter
  • Decorative wall protection / laminate-style wall panels
  • Trim and finish work
  • Final interior touch-ups
Commercial Project 07

Restaurant Kitchen Build-Out with Underground Plumbing & Grease Trap Installation

This commercial kitchen project involved the renovation and preparation of an existing restaurant kitchen for new equipment and code-compliant utility service. ESM Construction LLC performed floor cutting and trenching to relocate underground plumbing, install a new grease trap system, and prepare the kitchen for updated sink and equipment connections. The work also included light framing modifications, drop-ceiling grid installation, washable commercial kitchen ceiling panels, sprinkler adjustments, FRP wall finishes, quarry tile patching, and installation of a mop sink and kitchen equipment areas. The completed space was delivered clean, functional, and ready for commercial kitchen use.

Scope of work
  • Commercial kitchen renovation and build-out
  • Floor cutting and trenching for underground plumbing
  • Grease trap installation
  • Underground drain and waste line relocation
  • Plumbing rough-in for kitchen fixtures and equipment
  • Three-compartment sink area preparation
  • Mop sink installation
  • Light framing modifications
  • Drop ceiling grid installation
  • Washable kitchen ceiling tile installation
  • Sprinkler head lowering and adjustment
  • FRP wall finish installation
  • Quarry tile patching and floor restoration
  • Final cleanup and project delivery

Commercial Repairs & Small Projects

Real commercial repair and maintenance work completed for restaurants, offices, retail spaces, and other businesses.

Commercial RepairRestaurantKitchen RepairDrywallMetal Stud FramingStainless Steel

Restaurant Kitchen Wall Repair & Stainless Steel Replacement

Repair of a damaged restaurant kitchen wall caused by long-term water exposure behind the sink area. The work included removing and reinstalling the three-compartment sink, opening the wall, replacing deteriorated metal studs and track, repairing the wall assembly, installing new drywall, priming the surface, and installing new stainless-steel wall panels. After the wall repair was completed, the sink and accessories were reinstalled and returned to service.

Scope of work
  • Remove and reinstall three-compartment sink
  • Protect and keep mop sink/service area in place
  • Open damaged wall area
  • Remove deteriorated wall materials
  • Replace rusted and damaged metal studs and track
  • Repair wall framing
  • Install new drywall
  • Prime repaired wall surface
  • Install new stainless-steel wall panels
  • Reinstall shelves and sink components
  • Final commercial kitchen wall repair and restoration
Before repair – sink area and wall section prior to demolition
Before repair – sink area and wall section prior to demolition
Demolition phase – water-damaged wall opened for repair
Demolition phase – water-damaged wall opened for repair
Repair in progress – new metal stud framing and wall restoration
Repair in progress – new metal stud framing and wall restoration
Drywall phase – repaired wall closed and primed
Drywall phase – repaired wall closed and primed
Finishing phase – stainless-steel wall panels being installed
Finishing phase – stainless-steel wall panels being installed
Completed repair – new stainless-steel wall finish with sink reinstalled
Completed repair – new stainless-steel wall finish with sink reinstalled
Commercial RepairRestaurantDoor ReplacementMetal DoorCommercial DoorExit DoorHardware Installation

Restaurant Rear Access Door Replacement

Replacement of an old damaged rear commercial access door for a restaurant. The work included preparing the opening, installing new framing as needed, setting a new commercial metal door and frame, sealing the perimeter, and installing the required door hardware, including the panic bar and door closer. The new door was installed as a clean, secure, and professional rear kitchen access door.

Scope of work
  • Remove old damaged rear access door
  • Prepare and adjust door opening
  • Install new commercial metal door and frame
  • Install new framing as required
  • Set and secure new door assembly
  • Seal perimeter of frame
  • Install panic bar / exit device
  • Install door closer
  • Install door hardware and finishing components
  • Final adjustment and professional installation
Installation phase – rear restaurant access door opening and jobsite setup
Installation phase – rear restaurant access door opening and jobsite setup
Completed interior view – new commercial door with panic bar and closer installed
Completed interior view – new commercial door with panic bar and closer installed
Completed exterior view – new rear metal access door installed and finished
Completed exterior view – new rear metal access door installed and finished
Commercial RepairRestaurantCommercial KitchenWall RepairDrywallStainless Steel

Commercial Kitchen Wall Repair Behind Cooking Line

Repair of a damaged commercial kitchen wall behind the cooking line. The deteriorated lower wall section was opened and repaired, new drywall was installed, and the area was finished with new stainless-steel wall panels and protective base molding to provide a durable, washable surface and help prevent future water intrusion.

Scope of work
  • Inspect damaged lower wall section
  • Cut and remove affected wall materials
  • Repair deteriorated wall framing and substrate
  • Install new drywall
  • Prepare repaired wall surface
  • Install new stainless-steel wall panels
  • Install new protective base molding
  • Seal lower wall area
  • Final commercial kitchen repair and cleanup
BEFORE — Existing commercial kitchen wall behind the cooking line before repair.
BEFORE — Existing commercial kitchen wall behind the cooking line before repair.
REPAIR IN PROGRESS — Lower wall section opened for repair of damaged wall components.
REPAIR IN PROGRESS — Lower wall section opened for repair of damaged wall components.
COMPLETED — New stainless-steel wall finish and protective base molding installed.
COMPLETED — New stainless-steel wall finish and protective base molding installed.
Commercial RepairRestaurantCommercial KitchenStainless SteelWall RepairMetal Stud FramingDrywall

Commercial Kitchen Wall & Stainless Steel Restoration

Restoration of a deteriorated commercial kitchen wall located behind the sink and dishwasher area. Existing equipment was temporarily removed to access the damaged wall. Deteriorated wall materials and damaged metal framing were removed and replaced, new drywall was installed, and the wall was finished with new stainless-steel panels and commercial base tile. After the wall restoration was completed, the three-compartment sink, dishwasher, and related equipment were reinstalled and returned to service.

Scope of work
  • Temporary removal of three-compartment sink and kitchen equipment
  • Removal of damaged wall materials
  • Removal of deteriorated FRP and affected finishes
  • Replacement of damaged metal studs and track
  • New drywall installation and wall repair
  • Installation of new stainless-steel wall panels
  • Commercial base tile installation
  • Sealing and finishing of repaired areas
  • Reinstallation of three-compartment sink
  • Reinstallation of dishwasher and related equipment
  • Final cleanup and restoration of kitchen work area
BEFORE — Existing commercial kitchen sink and dishwasher area prior to wall repair.
BEFORE — Existing commercial kitchen sink and dishwasher area prior to wall repair.
REPAIR IN PROGRESS — Damaged lower wall opened, with deteriorated framing being removed and replaced.
REPAIR IN PROGRESS — Damaged lower wall opened, with deteriorated framing being removed and replaced.
RESTORATION IN PROGRESS — Rebuilt wall with new stainless-steel panels and commercial base tile installed.
RESTORATION IN PROGRESS — Rebuilt wall with new stainless-steel panels and commercial base tile installed.
Start your project

Ready to plan your remodel or build-out?

Tell us about your space and goals. We'll walk the site, scope the work, and send you a clear, written estimate.